# 300 Holger Way Data Center (Menlo Equities conversion)

300 Holger Way Data Center (Menlo Equities conversion) is a data center development record in San Jose, California.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/california/300-holger-way-data-center-menlo-equities-conversion-1a137d21041ca2cb14ec
Status: planning_approved
Operator: Menlo Equities (Holger Technology Partners LLC)
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/menlo-equities-300-holger-way-san-jose-ca) — Latest available status in the dated source record. Status source record date: 2026-09-21.
- [CEQAnet SCH 2026070652 — SP25-029 / ER25-243 300 Holger Way Data Center Project, Notice of Exemption (posted 2026-07-16)](https://ceqanet.lci.ca.gov/2026070652) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=300+HOLGER+WAY%2C+SAN+JOSE%2C+CA%2C+95134&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
