# 75 South Data Center Campus

75 South Data Center Campus is listed in Griffin, Georgia.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/georgia/75-south-data-center-campus-138a4bba25ebf406fabc
Status: in_planning
Operator: Industrial VI Enterprises LLC (with Hillwood Industrial/Logistics and PowerHouse)
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Griffin, Georgia, with Industrial VI Enterprises LLC (with Hillwood Industrial/Logistics and PowerHouse) listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/industrial-vi-75-south-data-center-campus-spalding-ga) — Latest available status in the dated source record. Status source record date: 2026-10-14.
- [Application for 4th data center withdrawn](https://www.griffindailynews.com/news/application-for-4th-data-center-withdrawn/article_3be6cf77-92b9-5a6e-b7b1-e957b9834b23.html) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1221+TOMOCHICHI+RD%2C+GRIFFIN%2C+GA%2C+30223&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
