# AirTrunk — legacy Stage 4 proposal

The legacy source labels this proposal AirTrunk Stage 4. Its exact phase boundary, footprint and relationship to the 51 Huntingwood Drive modification are not established by the retained entry. It is kept individually rather than merged using an assumed campus relationship.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/airtrunk-stage-4-58de987964
Status: Unknown
Operator: AirTrunk
Evidence reviewed: 2026-11-05

## Documented scope

The legacy source labels this proposal AirTrunk Stage 4. Its exact phase boundary, footprint and relationship to the 51 Huntingwood Drive modification are not established by the retained entry. It is kept individually rather than merged using an assumed campus relationship.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 2026-10-21
- [OpenStreetMap campus outline: AirTrunk Stage 4 (under construction)](https://www.openstreetmap.org/way/977492444) — 2026-10-21
- [Historical Elora map entry — unverified candidate: datacentre:1902712e6657d10f0d59537c](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
