# Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)

Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe) is listed in Chillicothe, Ohio.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/ohio/aligned-hpc-campus-at-former-pixelle-paper-mill-chillicothe-059cf8040cb3623894b7
Status: in_planning
Operator: Aligned
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Chillicothe, Ohio, with Aligned listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/aligned-chillicothe-ross-oh) — Latest available status in the dated source record. Status source record date: 2026-10-29.
- [$1.5 billion high-performance computing campus planned for former Chillicothe Paper Mill](https://sciotovalleyguardian.com/2026/07/02/1-5-billion-high-performance-computing-campus-planned-for-former-chillicothe-paper-mill/) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=232+E+8TH+ST%2C+CHILLICOTHE%2C+OH%2C+45601&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.