# Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)

Applied Digital Delta Forge 2 (Brookwood AI Factory Campus) is listed in Brookwood, Alabama.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/alabama/applied-digital-delta-forge-2-brookwood-ai-factory-campus-a5b6c43685397f80ec36
Status: in_planning
Operator: Applied Digital
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Brookwood, Alabama, with Applied Digital listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/applied-digital-delta-forge-2-brookwood-al) — Latest available status in the dated source record. Status source record date: 2026-10-18.
- [$3.2 Billion AI Data Center Campus Announced in Brookwood](https://abc3340.com/newsletter-daily/alabama-32-billion-ai-data-center-campus-announced-in-brookwood-brookwood-mayor-joe-barger-september-2026) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
