{"id": "US:dc:5a8e50f7c4be747b299d", "slug": "avaio-digital-taurus-phase-one-current-campus-build-5a8e50f7c4be747b299d", "kind": "data-centres", "name": "AVAIO Digital Taurus Phase One Current Campus Build", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/mississippi/avaio-digital-taurus-phase-one-current-campus-build-5a8e50f7c4be747b299d", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A5a8e50f7c4be747b299d", "country": "US", "country_name": "United States", "region": "MS", "region_name": "Mississippi", "locality": "", "address": "", "operator": "AVAIO Digital Partners", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-90.0185, 32.2593]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "AVAIO Digital Taurus Phase One Current Campus Build is listed in Mississippi.", "paragraphs": [{"heading": "Project overview", "text": "Data center building or phase in Mississippi, with AVAIO Digital Partners listed as operator."}], "facts": [{"label": "Map locator scope", "value": "Reviewed site locator"}, {"label": "Reported operator", "value": "AVAIO Digital Partners"}, {"label": "Related campus or site", "value": "AVAIO Digital Taurus Data Center Campus"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-08-25"}], "metrics": [], "sources": [{"title": "AVAIO Digital Partners", "url": "https://www.avaiodigital.com/developments/brandon-mississippi", "note": "Status observation for the listed project or phase. Status reported as of: 2026-08-25."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}