# AVAIO Digital Taurus Phase One Current Campus Build

AVAIO Digital Taurus Phase One Current Campus Build is listed in Mississippi.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/mississippi/avaio-digital-taurus-phase-one-current-campus-build-5a8e50f7c4be747b299d
Status: under_construction
Operator: AVAIO Digital Partners
Evidence reviewed: 2026-11-09

## Project overview

Data center building or phase in Mississippi, with AVAIO Digital Partners listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [AVAIO Digital Partners](https://www.avaiodigital.com/developments/brandon-mississippi) — Status observation for the listed project or phase. Status reported as of: 2026-08-25.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.