# AWS/A100 ROW Kelsterbach

AWS/A100 ROW Kelsterbach is a permit-only research location; a current data-centre project is unconfirmed in Langer Kornweg34e, Kelsterbach. The reported operator is A100 ROW.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/awsa100-row-kelsterbach-681eceff9bbf
Status: Permit only
Operator: A100 ROW
Evidence reviewed: 2026-11-10

## About this location

AWS/A100 ROW Kelsterbach is a permit-only research location; a current data-centre project is unconfirmed in Langer Kornweg34e, Kelsterbach. The reported operator is A100 ROW.

## Status evidence

Government authorization for the named data centre; construction/computing operation not established by the decision. Stage refers to the environmental/backup-generation permit; whole-facility development and computing operation remain unverified.

## Location evidence

Official source UTM zone32 site/chimney coordinates, transformed with pyproj from ETRS89/UTM32N. The circle covers all selected site points plus a250m allowance for chimney-to-facility extent and source datum/rounding uncertainty; it is not a surveyed building outline.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [A100Row GmbH, Rechenzentrum Data Center Kelsterbach, 04.04.2024](https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-04/24_04_04_genehmigungsbescheid_final_rz_kelsterbach_a_100_row.pdf) — 2024-04-04

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.