# Beard 2 Data Centre — Stage 2

A May 2026 environmental significance opinion describes the proposed Beard 2 Stage 2 data centre and future substation.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/australian-capital-territory/beard-2-data-centre-stage-2-12b2d94259
Status: Environmental significance opinion issued; construction not verified
Operator: Unknown
Evidence reviewed: 2026-11-05

## About this project

A May 2026 environmental significance opinion describes the proposed Beard 2 Stage 2 data centre and future substation.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [ACT Territory Planning Authority — Beard 2 Data Centre — Stage 2](https://www.planning.act.gov.au/__data/assets/pdf_file/0015/3063102/ESO202600012-Beard-Proposed-Data-Centre-Development-Beard-2.pdf) — Primary source reviewed 2026-11-05

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
