# Bitdeer Wenatchee 2026 AI Conversion Site Preparation

Bitdeer Wenatchee 2026 AI Conversion Site Preparation is a data center development record in Washington.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/washington/bitdeer-wenatchee-2026-ai-conversion-site-preparation-678780b9830413f24e37
Status: site_preparation
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Bitdeer Technologies Group](https://www.sec.gov/Archives/edgar/data/1899123/000121390026079816/ea029852701ex99-1.htm) — Status observation for the listed project or phase. Status reported as of: 2026-07-21.
- [Data Center Atlas](https://geocoding.geo.census.gov/geocoder/) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
