# Bitdeer Wenatchee (Pangborn) Data Center

Bitdeer Wenatchee (Pangborn) Data Center is a data center development record in East Wenatchee, Washington.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/washington/bitdeer-wenatchee-pangborn-data-center-2424eeffe68a483c053d
Status: under_construction
Operator: Bitdeer
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/bitdeer-wenatchee-pangborn-wa) — Latest available status in the dated source record. Status source record date: 2026-10-30.
- [Bitdeer Technologies Group FY2025 Form 20-F (filed 2026-04-30) — Item 4.D Property: Pangborn, Washington datacenter, 13 MW, operational May 2018, being converted to AI cloud (GB300 cluster; permits submitted; crypto dismantling began March 2026; target Q4 2026)](https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=624+URBAN+INDUSTRIAL+WAY%2C+EAST+WENATCHEE%2C+WA%2C+98802&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.