# Cellnex Goes

Cellnex Goes is a data centre project in Cornelisweg 10 4463 AK Goes. The reported operator is Cellnex.

Canonical: https://eloragrid.ai/land-grid/data-centres/netherlands/cellnex-goes-a10d20e7a75e
Status: Operating
Operator: Cellnex
Evidence reviewed: 2026-11-10

## About this location

Cellnex Goes is a data centre project in Cornelisweg 10 4463 AK Goes. The reported operator is Cellnex.

## Status evidence

Current first-party25location roster explicitly supplies data-centre specifications, physical address and services. Separate technology page confirms actual data-centre hosting in24towers plusMediaGateway, not generic telecommast counting.

## Location evidence

Published physical DC street and municipality/postal area matched to official PDOK address inventory. Screening circle bounds all 4 returned addresses on that street plus750m allowance; exact utility-building/house-number match not established. Street-address extent is a screening approximation, not a surveyed road or facility boundary.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Cellnex actual data-centre facility roster](https://www.cellnex.com/nl-nl/sections/locaties/) — 
- [Cellnex actual data-centre facility roster](https://www.cellnex.com/nl-nl/technology/edge-datacentres/) — 
- [Official named-street address extent](https://api.pdok.nl/bzk/locatieserver/search/v3_1/free?q=Cornelisweg&fq=type%3Aadres+AND+straatnaam%3A%22Cornelisweg%22&rows=100) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
