# Cipher Digital Black Pearl Phase II Current Build

Cipher Digital Black Pearl Phase II Current Build is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/cipher-digital-black-pearl-phase-ii-current-build-f8b563ffca6bc40c6988
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Cipher Digital Inc.](https://www.globenewswire.com/news-release/2026/08/04/3338166/0/en/cipher-digital-provides-second-quarter-2026-business-update.html) — Status observation for the listed project or phase. Status reported as of: 2026-08-04.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%2711786%20COUNTY%20ROAD%20209%27%20AND%20county%3D%27Winkler%27&outFields=*&returnGeometry=true&outSR=4326&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
