# Colovore RNO01 — second data center

Colovore RNO01 — second data center is a data center development record in Nevada.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/nevada/colovore-rno01-second-data-center-960c7b6e060d564afbd8
Status: under_construction
Operator: Colovore
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Colovore](https://www.colovore.com/news/colovore-completes-first-liquid-cooled-ai-data-center-in-reno-metro-area-to-support-companies-deploying-high-density-computing) — Status observation for the listed project or phase. Status reported as of: 2026-09-09.
- [Data Center Atlas](https://gis.dot.nv.gov/agsphs/rest/services/Reference/Statewide_Parcels/MapServer/0/query?where=County%3D%27Storey%27+AND+SiteAddress%3D%27100+ITALY+DR%27&outFields=APN%2CSiteAddress%2CSiteCity%2CAcres%2CCounty%2CSourceDate%2COwnerName&returnGeometry=true&outSR=4326&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
