# Colt Paris 2–4 Villebon campus

Colt Paris 2–4 Villebon campus is a data centre project in 20 Avenue du Québec ZA de Courtaboeuf  91140 Villebon-sur-Yvette. The reported operator is Colt DCS.

Canonical: https://eloragrid.ai/land-grid/data-centres/france/colt-paris-24-villebon-campus-40ffadd3a010
Status: Construction
Operator: Colt DCS
Evidence reviewed: 2026-11-10

## About this location

Colt Paris 2–4 Villebon campus is a data centre project in 20 Avenue du Québec ZA de Courtaboeuf  91140 Villebon-sur-Yvette. The reported operator is Colt DCS.

## Status evidence

Institut Paris Région site 128 contains 1 named DC building(s); published building status(es): en construction. Site stage follows existing activity, then construction, then proposal; forecast commissioning years are not treated as completion.

## Location evidence

Circle encloses the entire published Institut Paris Région site polygon, plus 25 m cartographic margin; not surveyed positional accuracy.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [COLT DATA CENTRE SERVICES FRANCE — ICPE 0006505160](https://georisques.gouv.fr/api/v1/installations_classees?codeAIOT=0006505160) — 2026-10-23
- [Essonne environmental authorisation — Colt 20 avenue du Québec](https://www.essonne.gouv.fr/contenu/telechargement/39826/349206/file/recueil-91-2024-128-recueil-des-actes-administratifs.pdf) — 
- [colt facility roster / report](https://www.coltdatacentres.net/fr-FR/press-releases/data-centres/2025/05/paris-ground-breaking) — 2025-05
- [Institut Paris Région 2026 sites — site 128](https://geoweb.iau-idf.fr/server/rest/services/Hosted/Data_centers_2025/FeatureServer/2) — 2026-06-30
- [Institut Paris Région 2026 buildings — site 128](https://geoweb.iau-idf.fr/server/rest/services/Hosted/Data_centers_2025/FeatureServer/1) — 2026-06-30

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.