# Crusoe Abilene AI factory campus for Microsoft

Crusoe Abilene AI factory campus for Microsoft is listed in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/crusoe-abilene-ai-factory-campus-for-microsoft-b24ed7da8d1f0e1cd025
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Texas, with Lancium listed as owner.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) — Status observation for the listed project or phase. Status reported as of: 2026-07-15.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
