# CyrusOne Bosque County data center campus (Thad Hill)

CyrusOne Bosque County data center campus (Thad Hill) is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/cyrusone-bosque-county-data-center-campus-thad-hill-79a6c006e2b25bc37ebf
Status: under_construction
Operator: CyrusOne
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Calpine](https://www.calpine.com/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas/) — Status observation for the listed project or phase. Status reported as of: 2025-11-03.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-97.38%2C%22ymin%22%3A31.835%2C%22xmax%22%3A-97.33%2C%22ymax%22%3A31.875%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&tolerance=0&mapExtent=-97.39%2C31.83%2C-97.32%2C31.88&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
