# Data Center at 3625 First Avenue South (SoDo)

Data Center at 3625 First Avenue South (SoDo) is listed in Seattle, Washington.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/washington/data-center-at-3625-first-avenue-south-sodo-341d60fdeead074d8b56
Status: in_planning
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Seattle, Washington.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/data-center-3625-first-ave-s-sodo-seattle-wa) — Latest available status in the dated source record. Status source record date: 2026-10-30.
- [Seattle banned new data centers. Why companies want them here anyway](https://www.kuow.org/stories/seattle-banned-new-data-centers-why-companies-want-them-here-anyway) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=3625+1ST+AVE+S%2C+SEATTLE%2C+WA%2C+98134&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.