# 10 Eastern Creek Drive — Phase 3 / ROMP03 fit-out

CDC-108743 covers the internal ROMP03, or Phase 3, fit-out of the facility identified in the filing as SYD055. It is an individually identified phase at 10 Eastern Creek Drive, separate from the other fit-out phases.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/data-centre-10-eastern-creek-drive-eastern-creek-2766-49b6023cbf
Status: Planning approved
Operator: Unknown
Evidence reviewed: 2026-11-05

## Documented scope

CDC-108743 covers the internal ROMP03, or Phase 3, fit-out of the facility identified in the filing as SYD055. It is an individually identified phase at 10 Eastern Creek Drive, separate from the other fit-out phases.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/map) — 2022-09-09
- [Retained planning filing CDC-108743](https://www.planningportal.nsw.gov.au/map) — 2022-09-09

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
