# Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567

Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567 is a data centre project in 42A BLUETT DRIVE SMEATON GRANGE 2567.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/data-centre-42a-bluett-drive-smeaton-grange-2567-9bf2618c8e
Status: Determined outcome unverified
Operator: Unknown
Evidence reviewed: 2026-11-05

## About this location

Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567 is a data centre project in 42A BLUETT DRIVE SMEATON GRANGE 2567.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/opendata/dataset/online-da-data-api) — 2025-05-13

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
