# DCI Eastern Creek — site certificates

The retained 90 Peter Brock Drive record contains four post-consent certificates and names Multiplex as a certificate builder. It documents the site separately from the approved campus expansion and the individually named SYD02 and SYD03 developments.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/data-centre-90-peter-brock-drive-eastern-creek-0079249298
Status: Unknown
Operator: Unknown
Evidence reviewed: 2026-11-05

## Documented scope

The retained 90 Peter Brock Drive record contains four post-consent certificates and names Multiplex as a certificate builder. It documents the site separately from the approved campus expansion and the individually named SYD02 and SYD03 developments.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 2026-10-21
- [NSW Planning Portal open data: CFT-996761 post-consent certificate, 90 Peter Brock Drive, Eastern Creek](https://www.planningportal.nsw.gov.au/opendata/dataset/online-pcc-data-api) — 2026-10-21
- [Data centre, 90 Peter Brock Drive, Eastern Creek — retained reference](https://www.planningportal.nsw.gov.au/opendata/dataset/online-pcc-data-api) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.