# Data centre - BRABHAM DRIVE EASTERN CREEK 2766

Planning application CDC-72768 for BRABHAM DRIVE EASTERN CREEK 2766 is recorded as withdrawn in the retained NSW Planning Portal filing. This status belongs to that application; it does not withdraw every development at the address.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/data-centre-brabham-drive-eastern-creek-2766-24f2dacccb
Status: Withdrawn
Operator: Unknown
Evidence reviewed: 2026-11-05

## Documented scope

Planning application CDC-72768 for BRABHAM DRIVE EASTERN CREEK 2766 is recorded as withdrawn in the retained NSW Planning Portal filing. This status belongs to that application; it does not withdraw every development at the address.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/map) — 2023-03-02
- [Retained planning filing CDC-72768](https://www.planningportal.nsw.gov.au/map) — 2023-03-02

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
