# DataBank Red Oak First-Phase

DataBank Red Oak First-Phase is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/databank-red-oak-first-phase-current-construction-0ce07b95e94425da2016
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [DataBank](https://www.databank.com/resources/news/inside-databanks-multibillion-dollar-red-oak-data-center-campus/) — Status observation for the listed project or phase. Status reported as of: 2026-07-26.
- [Data Center Atlas](https://maps.co.ellis.tx.us/arcgis/rest/services/Elections/External_Elections_Web_Map/MapServer/888/query?objectIds=70622&outFields=OBJECTID,Address,AddressLong,LandmkName,Placement,Parcel_ID,Source,DateUpdate,Post_Comm,Post_Code&returnGeometry=true&outSR=2276&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
