# Digi Power X Columbiana AI Data Center

Digi Power X Columbiana AI Data Center is listed in Columbiana, Alabama.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/alabama/digi-power-x-columbiana-ai-data-center-94a8e7809fcb4f194836
Status: under_construction
Operator: Digi Power X
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Columbiana, Alabama, with Digi Power X listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/digi-power-x-columbiana-al) — Latest available status in the dated source record. Status source record date: 2026-10-28.
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=130+INDUSTRIAL+PKWY%2C+COLUMBIANA%2C+AL%2C+35051&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
