Docklands Technical centre is a data centre project in Docklands Technical centre, Docklands Technical Centre, 1 Paul Julius Close, Blackwall Way Poplar, London, E14 2EH. The reported operator is TELEHOUSE INTERNATIONAL CORPORATION OF EUROPE LTD.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-kingdom/docklands-technical-centre-5e61b23aa7d2
Status: Operating
Operator: TELEHOUSE INTERNATIONAL CORPORATION OF EUROPE LTD
Evidence reviewed: 2026-11-10

## About this location

Docklands Technical centre is a data centre project in Docklands Technical centre, Docklands Technical Centre, 1 Paul Julius Close, Blackwall Way Poplar, London, E14 2EH. The reported operator is TELEHOUSE INTERNATIONAL CORPORATION OF EUROPE LTD.

## Status evidence

Current first-party London page identifies five existing Docklands data centres, including South opened2022; government Docklands Technical Centre permit matches campus. Current page undated; reviewed2026-11-10 separately from historical permit issue date.

## Location evidence

Published EA site grid reference TQ3862080630 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Docklands Technical centre](https://environment.data.gov.uk/public-register/industrial-installations/registration/EPR-EP3507SL) — 2020-10-13
- [Telehouse London facility roster](https://www.telehouse.net/data-centre-services/uk/london/?location=london) — 
- [Current government DATC facility membership DATC/F00091](https://environment.data.gov.uk/api/file/download?fileDataSetId=e3525ee0-4725-4626-a21e-1687872602fc&fileName=Climate_Change_Agreements.xlsx) — 2026-09-18
- [Schedule4 named DC facility DATC/F00091](https://s3.amazonaws.com/thegovernmentsays-files/attachments/177/1777179-1-Umbrella_climate_change_agreement_for_the_data_centre_sector.pdf) — 2020-12-18

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.