DCI SYD02 is a separately identified expansion at the existing Eastern Creek site. SSD-21342738-Mod-2, covering increased power consumption and equipment changes, was approved on 5 August 2026. SYD03 remains a separate named development and does not inherit SYD02’s electrical design or status.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/eastern-creek-data-centre-expansion-project-41d10f8112
Status: Planning approved
Operator: Unknown
Evidence reviewed: 2026-11-05

## Documented scope

DCI SYD02 is a separately identified expansion at the existing Eastern Creek site. SSD-21342738-Mod-2, covering increased power consumption and equipment changes, was approved on 5 August 2026. SYD03 remains a separate named development and does not inherit SYD02’s electrical design or status.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/major-projects/projects/eastern-creek-data-centre-mod-2-power-consumption-increase) — 
- [Original source](https://dcidatacenters.com/locations/) — 
- [DCI SYD02 — retained reference](https://dcidatacenters.com/locations/) — 
- [Appendix E_Infrastructure Servicing Strategy](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-21342738-MOD-2%2120260120T003952.458+GMT) — 
- [MOD 2 - Assessment Report](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-21342738-MOD-2%2120260812T003248.610+GMT) — 
- [Eastern Creek Data Centre Expansion Project — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/eastern-creek-data-centre-mod-2-power-consumption-increase) — 
- [Eastern Creek Data Centre Expansion Project — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/eastern-creek-data-centre-expansion-project) — 
- [DCI SYD02 construction update — July 2026](https://dcidatacenters.com/news/dci-advances-syd02-expansion-in-sydney-as-key-construction-milestones-near-completion/) — 
- [DPHI approved SYD02 construction staging — 10 October 2025, PDF pp.1,3](https://dcidatacenters.com/wp-content/uploads/2026/07/Approval-of-Development-Staging.pdf) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.