EcoDataCenter Borlänge campus is a data centre project in Kvarnsvedsvägen 420, 78466 Borlänge, Sweden. The reported operator is EcoDataCenter.

Canonical: https://eloragrid.ai/land-grid/data-centres/sweden/ecodatacenter-borlange-campus-1ae7b6fe6906
Status: Construction
Operator: EcoDataCenter
Evidence reviewed: 2026-11-10

## About this location

EcoDataCenter Borlänge campus is a data centre project in Kvarnsvedsvägen 420, 78466 Borlänge, Sweden. The reported operator is EcoDataCenter.

## Status evidence

Current individual operator page explicitly says construction began in September2025 at formerKvarnsvedenpapermill, with phase1mid2027completion forecast. Forecast not treated as operation.

## Location evidence

Published physical facility address/named industrial district matched to Photon/OpenStreetMap in the correct country. 3765m screening circle covers the compact returned exact-address/area matches with allowance.  Exact footprint not surveyed.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [ecodatacenter-borlange-current](https://ecodatacenter.tech/data-center/ecodatacenter2) — 
- [Reviewed physical-site geocoding match](https://photon.komoot.io/api/?q=Kvarnsvedsv%C3%A4gen+420+Borl%C3%A4nge+Sweden&limit=5&lang=en) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.