# EdgeConneX Bergsbyn AI DC proposal

EdgeConneX Bergsbyn AI DC proposal is a data centre project in Bergsbyn industrial area. The reported operator is EdgeConneX.

Canonical: https://eloragrid.ai/land-grid/data-centres/sweden/edgeconnex-bergsbyn-ai-dc-proposal-94bae73c4445
Status: Announced
Operator: EdgeConneX
Evidence reviewed: 2026-11-10

## About this location

EdgeConneX Bergsbyn AI DC proposal is a data centre project in Bergsbyn industrial area. The reported operator is EdgeConneX.

## Status evidence

Government describes a specific EdgeConneX DC development on acquired Bergsbyn industrial land and explicitly says it is early-stage and will take years. No construction or operation is inferred.

## Location evidence

Government locates future EdgeConneX DC on the former Northvolt expansion land acquired from Lyten. Reviewed Lyten Ett industrial polygon bounds the original industrial complex; the battery factory is not itself relabelled as a DC. The 3000m radius is a screening bound, not a surveyed building footprint.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [edgeconnex-bergsbyn-government](https://skelleftea.se/extraordinara-handelser/bergsbyns-industriomrade/en/the-development-of-the-bergsbyn-industrial-area-in-skelleftea/questions-and-answers) — 
- [Reviewed known-site geocoding match](https://photon.komoot.io/api/?q=Northvolt+Ett+Skellefte%C3%A5+Sweden&limit=5&lang=en) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.