# Edged Salt Lake City Data Center (Project Inabi)

Edged Salt Lake City Data Center (Project Inabi) is a data center development record in Bluffdale, Utah.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/utah/edged-salt-lake-city-data-center-project-inabi-184ef6cdc96747d4abf2
Status: under_construction
Operator: Edged Energy
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/edged-bluffdale-ut) — Latest available status in the dated source record. Status source record date: 2026-10-13.
- [Edged Energy: Bluffdale, UT](https://baxtel.com/data-center/edged-energy-bluffdale-ut) — 
- [Bluffdale City Planning Commission agenda, Dec 6, 2023 (Project Inabi Edged Data Center site plan)](https://www.utah.gov/pmn/sitemap/notice/876505.html) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=600+W+14600+S%2C+BLUFFDALE%2C+UT%2C+84065&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
