# Energizer II Data Center (BPA L0702)

Energizer II Data Center (BPA L0702) is listed in Washington.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/washington/energizer-ii-data-center-bpa-l0702-40438832da63b9d288f5
Status: in_planning
Operator: Savion (Shell Energy subsidiary), per BPA application documents
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Washington, with Savion (Shell Energy subsidiary), per BPA application documents listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/energizer-ii-data-center-goodnoe-hills-klickitat-wa) — Latest available status in the dated source record. Status source record date: 2026-10-30.
- [Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)](https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.