# Energy North Project Ares

Energy North proposes a 1 GW IT hyperscale campus near Elliott, integrated with solar, batteries and gas-fired generation.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/northern-territory/energy-north-project-ares-7782542a5e
Status: Environmental assessment process; referral stage documented
Operator: Energy North Pty Ltd
Evidence reviewed: 2026-11-05

## About this project

Energy North proposes a 1 GW IT hyperscale campus near Elliott, integrated with solar, batteries and gas-fired generation.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Northern Territory EPA — Energy North Project Ares](https://ntepa.nt.gov.au/consultation/project-ares) — Primary source reviewed 2026-11-05

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
