# Exea Torun DC

Exea Torun DC is a data centre project in Włocławska 167,87-100 Toruń. The reported operator is Exea.

Canonical: https://eloragrid.ai/land-grid/data-centres/poland/exea-torun-dc-31b5c23c7892
Status: Operating
Operator: Exea
Evidence reviewed: 2026-11-10

## About this location

Exea Torun DC is a data centre project in Włocławska 167,87-100 Toruń. The reported operator is Exea.

## Status evidence

Current primary dedicated operating DC offer plus primary technical sheet identify the physical site atWloclawska167.2022address-sheet date is distinguished from current undated computing offer; extra halls are not counted separately.

## Location evidence

Primary facility street/locality is reconciled with the matching OpenStreetMap Nominatim address area. Circle includes locator bounds and uncertainty. Geocoder tags never establish computing identity.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Primary physical DC location/function exea-current](https://exea.pl/exea-data-center) — 
- [Primary physical DC location/function exea-sheet](https://exea-static.s3.exea.pl/Exea_Data_Center_d29dde78ea.pdf?updated_at=2022-04-05T04%3A59%3A53.416Z) — 
- [OpenStreetMap Nominatim documentary-address geocoding](https://nominatim.openstreetmap.org/search?q=W%C5%82oc%C5%82awska+167%2C87-100+Toru%C5%84%2C+Poland&format=jsonv2&addressdetails=1&limit=3&countrycodes=pl) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.