{"id": "US:dc:eaa7f6b87fdc93dd1666", "slug": "fermi-america-project-matador-campus-eaa7f6b87fdc93dd1666", "kind": "data-centres", "name": "Fermi America Project Matador campus", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/fermi-america-project-matador-campus-eaa7f6b87fdc93dd1666", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3Aeaa7f6b87fdc93dd1666", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "", "address": "", "operator": "CBRE; NAES Corporation", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-101.569, 35.283762]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Fermi America Project Matador campus is a data center development record in Texas.", "paragraphs": [], "facts": [{"label": "Map locator scope", "value": "Campus locator"}, {"label": "Reported operator", "value": "CBRE; NAES Corporation"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-09-28"}, {"label": "Status source publication date", "value": "2026-08-14"}], "metrics": [], "sources": [{"title": "U.S. Securities and Exchange Commission (Fermi Inc. filing)", "url": "https://www.sec.gov/Archives/edgar/data/2071778/000207177826000051/frmi-20260630.htm", "note": "Status observation for the listed project or phase. Status reported as of: 2026-09-28."}, {"title": "Data Center Atlas", "url": "https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx", "note": "Site or campus locator, as attributed in the source."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}