{"id": "US:dc:9c1d794fd6b5cc8c6b5a", "slug": "galaxy-helios-phase-ii-260-mw-critical-it-build-9c1d794fd6b5cc8c6b5a", "kind": "data-centres", "name": "Galaxy Helios Phase II 260 MW Critical IT Build", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/galaxy-helios-phase-ii-260-mw-critical-it-build-9c1d794fd6b5cc8c6b5a", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A9c1d794fd6b5cc8c6b5a", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "", "address": "", "operator": "", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-100.867099886006, 33.780636279018]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Galaxy Helios Phase II 260 MW Critical IT Build is a data center development record in Texas.", "paragraphs": [], "facts": [{"label": "Map locator scope", "value": "Campus locator"}, {"label": "Related campus or site", "value": "Galaxy Helios Data Center Campus"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-08-12"}], "metrics": [], "sources": [{"title": "Galaxy Digital", "url": "https://www.galaxy.com/newsroom/q226-unwrapped", "note": "Status observation for the listed project or phase. Status reported as of: 2026-08-12."}, {"title": "Data Center Atlas", "url": "https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=984%20County%20Road%20112%20Afton%20TX%2079220&benchmark=Public_AR_Current&format=json", "note": "Site or campus locator, as attributed in the source."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}