# Galaxy Helios Phase II 260 MW Critical IT Build

Galaxy Helios Phase II 260 MW Critical IT Build is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/galaxy-helios-phase-ii-260-mw-critical-it-build-9c1d794fd6b5cc8c6b5a
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Galaxy Digital](https://www.galaxy.com/newsroom/q226-unwrapped) — Status observation for the listed project or phase. Status reported as of: 2026-08-12.
- [Data Center Atlas](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=984%20County%20Road%20112%20Afton%20TX%2079220&benchmark=Public_AR_Current&format=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.