# Google Mesa Red Hawk — Phase 3 (PH03) data hall building

Google Mesa Red Hawk — Phase 3 (PH03) data hall building is a data center development record in Arizona.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/arizona/google-mesa-red-hawk-phase-3-ph03-data-hall-building-5b605c610f6510815aa4
Status: under_construction
Operator: Google
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [City of Mesa, Arizona (Development Services)](https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$where=permit_number%20in('PMT26-01256','PMT25-22348','PMT26-08686','PMT24-16556')&$order=scheduled_date&$limit=2000) — Status observation for the listed project or phase. Status reported as of: 2026-10-22.
- [Data Center Atlas](https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0/query?where=APN+IN+%28%2730405019P%27%2C%2730405019Q%27%29&outFields=APN,APN_DASH,OWNER_NAME,MAIL_ADDR1,MAIL_CITY,MAIL_STATE,PHYSICAL_ADDRESS,SUBNAME,LOT_NUM,MCRNUM,LAND_SIZE,DEED_NUMBER,DEED_DATE,PUC,CONST_YEAR,JURISDICTION,STR&returnGeometry=true&outSR=4326&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 
- [SRP Project Red Hawk](https://www.srpnet.com/grid-water-management/grid-management/improvement-projects/project-red-hawk) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.