# Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR

Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR is a data centre project in Planckstr 1, 64291 Darmstadt. The reported operator is Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/green-it-cube-hochstleistungsrechenzentrum-fur-gsi-und-fair-32437c92dd94
Status: Operating
Operator: Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR
Evidence reviewed: 2026-11-10

## About this location

Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR is a data centre project in Planckstr 1, 64291 Darmstadt. The reported operator is Green IT Cube: Höchstleistungsrechenzentrum für GSI und FAIR.

## Status evidence

The current public government annual-report export identifies this named whole data-centre reporting unit, operator/owner, five-digit postal code, actual annual facility energy, IT connected load, computing traffic and PUE. This is computing-function evidence for reporting2025, not a generator permit or an active-company inference. Export has no street/year column; reporting2025 is explicitly inferred from annual-page latest-year wording and official statistics selector2025. November2026 download/review is not observation date. Names/codes are preserved; cooling circuits, data halls and repeated annual observations are never invented as new facilities. Exact prior facility code/name/operator and locality/postal crosswalk retains the existing identity, documentary address and stronger location. Government operator/owner fields are observations as of reporting2025, not proof of a later ownership transfer. No proximity-based merge.

## Location evidence

Exact existing reviewed facility location retained: Published operator facility point. 750m uncertainty radius allows for point/campus extent; not a surveyed building boundary.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [German Datacenter Association operator participants facility evidence](https://tdorz.de/standort/gsi-green-it-cube/) — 2026-11-06
- [German government public DC energy register2025 annual-report export](https://rechenzentrumsregister.bund.de/de/annual-reports/) — 2025
- [Official public RZReg statistics/reporting-year selector](https://rechenzentrumsregister.bund.de/de/statistic/) — 2025
- [Official public RZReg computing-energy definitions](https://rechenzentrumsregister.bund.de/de/knowledge/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
