# GreenSquare SYD1 — campus overview

The SYD1 campus comprises an operating first stage and a separately proposed second stage. The operator's October 2026 announcement distinguishes them. Campus-wide power and capacity descriptions must not be assigned in full to each stage.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/greensquaredc-syd1-norwest-6846ff264f
Status: Unknown
Operator: GreenSquareDC
Evidence reviewed: 2026-11-05

## Documented scope

The SYD1 campus comprises an operating first stage and a separately proposed second stage. The operator's October 2026 announcement distinguishes them. Campus-wide power and capacity descriptions must not be assigned in full to each stage.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 2026-10-21
- [GreenSquareDC website: SYD1 Norwest](https://greensquaredc.com/locations/) — 2026-10-21
- [GreenSquareDC SYD1 Norwest — retained reference](https://greensquaredc.com/locations/) — 
- [Data Center Map facility listing](https://www.datacentermap.com/australia/sydney/greensquaredc-syd1/) — Discovery and directory address; operational status is not independently established by this listing.
- [Operator or government facility evidence](https://www.planningportal.nsw.gov.au/major-projects/projects/brookhollow-avenue-data-centre-expansion-norwest) — Primary publisher contains the facility street address
- [Operator or government facility evidence](https://greensquaredc.com/locations/) — Operator publisher identifies the exact facility code; address retained separately from directory

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
