# Hetzner FSN1-DC3

Hetzner FSN1-DC3 is a data centre project in Am Datacenter-Park 1, 08223 Falkenstein/Vogtland. The reported operator is Hetzner Online.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/hetzner-fsn1-dc3-7350bc0597f1
Status: Operating
Operator: Hetzner Online
Evidence reviewed: 2026-11-10

## About this location

Hetzner FSN1-DC3 is a data centre project in Am Datacenter-Park 1, 08223 Falkenstein/Vogtland. The reported operator is Hetzner Online.

## Status evidence

Current2026 operator documentation already proves independent DC2/DC3. The2025 government annual report combines them as FSN-DC2-3. Same annual energy observation linked to both with shared scope; it is never summed twice, divided, or counted as a third facility.

## Location evidence

Exact existing reviewed facility retains its documented stronger location. Exact published operating DC code at the documented Hetzner park. Prior government-derived street/campus locator retained with2000m screening radius; individual building footprint is not published. Nürnberg source postcode09431 is a source typo, corrected90431 using the actual named city/street; not relocated toSchwandorf.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Hetzner official Falkenstein data-centre park address and access](https://docs.hetzner.com/general/others/data-centers-and-connection/) — 2026-10-05
- [Hetzner current facility-code operating status](https://status.hetzner.com/) — 
- [BfEE/BAFA facility evidence](https://www.bfee-online.de/SharedDocs/Downloads/BfEE/DE/Effizienzpolitik/pfa_veroeffentlichung_daten.xlsx?__blob=publicationFile&v=9) — 
- [AwaNetz publicly published live official heat-potential CSV](https://firebasestorage.googleapis.com/v0/b/awanetz-pfa-integration.firebasestorage.app/o/map_data%2Flive_data.csv?alt=media) — 
- [German government public DC energy register2025 annual-report export](https://rechenzentrumsregister.bund.de/de/annual-reports/) — 2025
- [Official public RZReg statistics/reporting-year selector](https://rechenzentrumsregister.bund.de/de/statistic/) — 2025
- [Official public RZReg computing-energy definitions](https://rechenzentrumsregister.bund.de/de/knowledge/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
