# Hetzner NBG1-DC1

Hetzner NBG1-DC1 is a data centre project in Sigmundstraße 135, 90431 Nürnberg. The reported operator is Hetzner Online.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/hetzner-nbg1-dc1-447a8b727a32
Status: Operating
Operator: Hetzner Online
Evidence reviewed: 2026-11-10

## About this location

Hetzner NBG1-DC1 is a data centre project in Sigmundstraße 135, 90431 Nürnberg. The reported operator is Hetzner Online.

## Status evidence

The current public government annual-report export identifies this named whole data-centre reporting unit, operator/owner, five-digit postal code, actual annual facility energy, IT connected load, computing traffic and PUE. This is computing-function evidence for reporting2025, not a generator permit or an active-company inference. Export has no street/year column; reporting2025 is explicitly inferred from annual-page latest-year wording and official statistics selector2025. November2026 download/review is not observation date. Names/codes are preserved; cooling circuits, data halls and repeated annual observations are never invented as new facilities. Exact prior facility code/name/operator and locality/postal crosswalk retains the existing identity, documentary address and stronger location. Government operator/owner fields are observations as of reporting2025, not proof of a later ownership transfer. No proximity-based merge.

## Location evidence

Exact existing reviewed facility location retained: Exact published operating DC code at the documented Hetzner park. Prior government-derived street/campus locator retained with2000m screening radius; individual building footprint is not published. Nürnberg source postcode09431 is a source typo, corrected90431 using the actual named city/street; not relocated toSchwandorf.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Hetzner official Falkenstein data-centre park address and access](https://docs.hetzner.com/general/others/data-centers-and-connection/) — 2026-10-05
- [Hetzner current facility-code operating status](https://status.hetzner.com/) — 
- [German government public DC energy register2025 annual-report export](https://rechenzentrumsregister.bund.de/de/annual-reports/) — 2025
- [Official public RZReg statistics/reporting-year selector](https://rechenzentrumsregister.bund.de/de/statistic/) — 2025
- [Official public RZReg computing-energy definitions](https://rechenzentrumsregister.bund.de/de/knowledge/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
