{"id": "US:dc:93acaaaf8360f5a3907b", "slug": "hut-8-beacon-point-first-phase-352-mw-critical-it-lease-93acaaaf8360f5a3907b", "kind": "data-centres", "name": "Hut 8 Beacon Point First Phase 352 MW Critical IT Lease", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/hut-8-beacon-point-first-phase-352-mw-critical-it-lease-93acaaaf8360f5a3907b", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A93acaaaf8360f5a3907b", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "", "address": "", "operator": "", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-97.614758, 27.834525]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Hut 8 Beacon Point First Phase 352 MW Critical IT Lease is listed in Texas.", "paragraphs": [{"heading": "Project overview", "text": "Data center building or phase in Texas."}], "facts": [{"label": "Map locator scope", "value": "Campus locator"}, {"label": "Related campus or site", "value": "Hut 8 Beacon Point AI Data Center Campus"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-11-04"}], "metrics": [], "sources": [{"title": "Hut 8 Corp.", "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-third-quarter-2026-results", "note": "Status observation for the listed project or phase. Status reported as of: 2026-11-04."}, {"title": "Data Center Atlas", "url": "https://www.hut8.com/data-centers/beacon-point", "note": "Site or campus locator, as attributed in the source."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}