# Hut 8 Beacon Point First Phase 352 MW Critical IT Lease

Hut 8 Beacon Point First Phase 352 MW Critical IT Lease is listed in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/hut-8-beacon-point-first-phase-352-mw-critical-it-lease-93acaaaf8360f5a3907b
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center building or phase in Texas.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Hut 8 Corp.](https://www.hut8.com/news-insights/press-releases/hut-8-reports-third-quarter-2026-results) — Status observation for the listed project or phase. Status reported as of: 2026-11-04.
- [Data Center Atlas](https://www.hut8.com/data-centers/beacon-point) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.