{"id": "US:dc:ce9e6c8f022eae5a1719", "slug": "hut-8-river-bend-245-mw-critical-it-current-build-ce9e6c8f022eae5a1719", "kind": "data-centres", "name": "Hut 8 River Bend 245 MW Critical IT Current Build", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/louisiana/hut-8-river-bend-245-mw-critical-it-current-build-ce9e6c8f022eae5a1719", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3Ace9e6c8f022eae5a1719", "country": "US", "country_name": "United States", "region": "LA", "region_name": "Louisiana", "locality": "", "address": "", "operator": "", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-91.299513, 30.727892]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Hut 8 River Bend 245 MW Critical IT Current Build is listed in Louisiana.", "paragraphs": [{"heading": "Project overview", "text": "Data center building or phase in Louisiana."}], "facts": [{"label": "Map locator scope", "value": "Campus locator"}, {"label": "Related campus or site", "value": "Hut 8 River Bend AI Data Center Campus"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-11-04"}], "metrics": [], "sources": [{"title": "Hut 8 Corp.", "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-third-quarter-2026-results", "note": "Status observation for the listed project or phase. Status reported as of: 2026-11-04."}, {"title": "Data Center Atlas", "url": "https://www.hut8.com/data-centers/river-bend", "note": "Site or campus locator, as attributed in the source."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}