# Hut 8 River Bend Campus

Hut 8 River Bend Campus is a data center development record in St. Francisville, Louisiana.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/louisiana/hut-8-river-bend-campus-c929948417e0ce558302
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Data Center Census](https://datacentercensus.com/dc/river-bend-west-feliciana-la) — Latest available status in the dated source record. Status source record date: 2026-11-07.
- [Hut 8 lands a massive partnership for its West Feliciana data center](https://www.1012industryreport.com/technology/ai/hut-8-lands-a-massive-partnership-for-its-west-feliciana-data-center/) — 
- [Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center](https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center) — 
- [Hut 8 secures 592 acres for 300MW Bitcoin and AI data center](https://www.datacenterdynamics.com/en/news/hut-8-secures-592-acres-for-300mw-bitcoin-and-ai-data-center/) — 
- [River Bend | Hut 8](https://www.hut8.com/data-centers/river-bend) — 
- [Hut 8 selects Entergy, Southeast Louisiana for $10 billion artificial intelligence data center](https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center) — 
- [Hut 8 commits $16 million for 'closed loop' water infrastructure](https://bizmagsb.com/hut-8-commits-16-million-for-closed-loop-water-infrastructure/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
