# HyperDataGrid Parsons Data Center

HyperDataGrid Parsons Data Center is listed in Parsons, Kansas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/kansas/hyperdatagrid-parsons-data-center-b838b5aab0b25dc9919c
Status: in_planning
Operator: HyperDataGrid
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Parsons, Kansas, with HyperDataGrid listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/hyperdatagrid-parsons-ks) — Latest available status in the dated source record. Status source record date: 2026-10-04.
- [20MW data center project proposed in Parsons, Kansas](https://baxtel.com/news/20mw-data-center-project-proposed-in-parsons-kansas) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.