{"id": "US:dc:ca7d41bc815f68e5ec9a", "slug": "iren-sweetwater-1-liquid-cooled-data-centre-construction-300-mw-gross-first-phase-on-the-1-400-mw-campus-ca7d41bc815f68e5ec9a", "kind": "data-centres", "name": "IREN Sweetwater 1", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/iren-sweetwater-1-liquid-cooled-data-centre-construction-300-mw-gross-first-phase-on-the-1-400-mw-campus-ca7d41bc815f68e5ec9a", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3Aca7d41bc815f68e5ec9a", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "", "address": "", "operator": "IREN", "status": "under_construction", "geometry": {"type": "Point", "coordinates": [-100.5600317, 32.6396263]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "IREN Sweetwater 1 is a data center development record in Texas.", "paragraphs": [], "facts": [{"label": "Map locator scope", "value": "Campus locator"}, {"label": "Reported operator", "value": "IREN"}, {"label": "Reported owner", "value": "IE US Development Holdings 5 Inc; IREN"}, {"label": "Related campus or site", "value": "IREN Sweetwater 1 campus, FM 611, Fisher County (north of Sweetwater)"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status reported as of", "value": "2026-11-05"}], "metrics": [], "sources": [{"title": "IREN", "url": "https://clientapi.gcs-web.com/data/0f6ccba3-7d70-47a2-8860-e03503f8525c/news/12696/html", "note": "Status observation for the listed project or phase. Status reported as of: 2026-11-05."}, {"title": "Data Center Atlas", "url": "https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-100.6200%2C%22ymin%22%3A32.5800%2C%22xmax%22%3A-100.4400%2C%22ymax%22%3A32.7000%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&tolerance=0&mapExtent=-100.6200%2C32.5800%2C-100.4400%2C32.7000&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json", "note": "Site or campus locator, as attributed in the source."}, {"title": "Data Center Atlas", "url": "https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}