# IREN Sweetwater 1

IREN Sweetwater 1 is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/iren-sweetwater-1-liquid-cooled-data-centre-construction-300-mw-gross-first-phase-on-the-1-400-mw-campus-ca7d41bc815f68e5ec9a
Status: under_construction
Operator: IREN
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [IREN](https://clientapi.gcs-web.com/data/0f6ccba3-7d70-47a2-8860-e03503f8525c/news/12696/html) — Status observation for the listed project or phase. Status reported as of: 2026-11-05.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-100.6200%2C%22ymin%22%3A32.5800%2C%22xmax%22%3A-100.4400%2C%22ymax%22%3A32.7000%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&tolerance=0&mapExtent=-100.6200%2C32.5800%2C-100.4400%2C32.7000&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
