# Iron Mountain MAD-1

Iron Mountain MAD-1 is a data centre project in Calle Mar Egeo, San Fernando de Henares. The reported operator is Iron Mountain.

Canonical: https://eloragrid.ai/land-grid/data-centres/spain/iron-mountain-mad-1-7e642c47ec57
Status: Operating
Operator: Iron Mountain
Evidence reviewed: 2026-11-10

## About this location

Iron Mountain MAD-1 is a data centre project in Calle Mar Egeo, San Fernando de Henares. The reported operator is Iron Mountain.

## Status evidence

Current first-party individual profile reports MAD-1 live at3MW. Halls are not separate facilities.

## Location evidence

Explicit physical-facility street or named industrial-park crosswalk, correct municipality and country. Broad street/park circle covers unresolved house or campus position. Reference businesses and transport objects are used only to locate the named area. Displayed circle is a location allowance, not a surveyed building outline.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Iron Mountain facility roster](https://datacenter.ironmountain.com/madrid-data-centers-information-contact) — 
- [Cached Photon / OpenStreetMap address crosswalk](https://photon.komoot.io/api/?q=Calle+Mar+Egeo%2C+San+Fernando+de+Henares+Spain&limit=5) — 
- [Iron Mountain facility roster](https://datacenter.ironmountain.com/hubfs/IMDC-MAD-1-Overview_09082023%20%281%29.pdf?hsLang=es-es) — 2023-09
- [Comunidad de Madrid facility roster](https://www.bocm.es/boletin/CM_Orden_BOCM/2025/11/12/BOCM-20251112-65.PDF) — 2025-11-12

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
