# Iron Mountain VA-9 Phase 1

Iron Mountain VA-9 Phase 1 is a data center development record in Virginia.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/virginia/iron-mountain-va-9-phase-1-7816b7c218e21fdd84a8
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Iron Mountain Incorporated](https://s204.q4cdn.com/148941814/files/content_files/Q3-2026-SRP-vFinal.pdf) — Status observation for the listed project or phase. Status reported as of: 2026-09-30.
- [Data Center Atlas](https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/10/query?where=BuildingName%20LIKE%20%27Iron%20Mountain%25%27&outFields=OBJECTID,GPIN,BuildingName,Address,BuildingID,BuildingStatus,YearBuilt,PermitCase,PermitStatus,GFA,DCOOD,OCCDate,LastEditDate,PlanningCaseNumber&returnGeometry=true&outSR=4326&orderByFields=OBJECTID&f=geojson) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
