# ITENOS Frankfurt FRA1

ITENOS Frankfurt FRA1 is a data centre project in Rebstöcker Straße 25-31, 60326 Frankfurt am Main, St.. The reported operator is ITENOS.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/itenos-frankfurt-fra1-fbd4715da436
Status: Operating
Operator: ITENOS
Evidence reviewed: 2026-11-10

## About this location

ITENOS Frankfurt FRA1 is a data centre project in Rebstöcker Straße 25-31, 60326 Frankfurt am Main, St.. The reported operator is ITENOS.

## Status evidence

The current public government annual-report export identifies this named whole data-centre reporting unit, operator/owner, five-digit postal code, actual annual facility energy, IT connected load, computing traffic and PUE. This is computing-function evidence for reporting2025, not a generator permit or an active-company inference. Export has no street/year column; reporting2025 is explicitly inferred from annual-page latest-year wording and official statistics selector2025. November2026 download/review is not observation date. Names/codes are preserved; cooling circuits, data halls and repeated annual observations are never invented as new facilities. Exact prior facility code/name/operator and locality/postal crosswalk retains the existing identity, documentary address and stronger location. Government operator/owner fields are observations as of reporting2025, not proof of a later ownership transfer. No proximity-based merge. Current ITENOS marketing FRA1 street Kleyer90 differs from prior Rebstöcker25-31; this register has only60326 and cannot adjudicate the exact street. Existing source-location discrepancy remains explicit, not silently moved.

## Location evidence

Exact existing reviewed facility location retained: Official source UTM zone32 site/chimney coordinates, transformed with pyproj from ETRS89/UTM32N. The circle covers all selected site points plus a250m allowance for chimney-to-facility extent and source datum/rounding uncertainty; it is not a surveyed building outline.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Hesse combustion plant public register as of1January2026](https://www.hlnug.de/fileadmin/dokumente/luft/44_BImSchV/Anlagenregister_HE_20260101.pdf) — 2025-12-30
- [ITENOS Frankfurt1 Kleyerstrasse facility](https://itenos.de/de/rechenzentrum-anbieter/rechenzentrum-deutschland/rechenzentrum-frankfurt-1/) — 
- [German government public DC energy register2025 annual-report export](https://rechenzentrumsregister.bund.de/de/annual-reports/) — 2025
- [Official public RZReg statistics/reporting-year selector](https://rechenzentrumsregister.bund.de/de/statistic/) — 2025
- [Official public RZReg computing-energy definitions](https://rechenzentrumsregister.bund.de/de/knowledge/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
